2026’s biggest deal:up to $1,100 off per Vibe Board
2026’s biggest deal:up to $1,100 off per Vibe Board
From $3,499 or $113/mo withAffirm Logo
Buy NowRequest a Demo

40,000+ business leaders use Vibe smart whiteboard

Elevate your meetings and presentations to the next level

Vibe Board S1 Ranked Amazon's #1 Best Seller in 2026Vibe Board S1 Earned Amazon's Choice Badge and a 4.5-Star Customer RatingVibe Board S1 Earns a 4.7-Star Rating on Reviews.io
From $3,999$3,499$3,499
$500 off
To speak to a human, call:+1 (385) 341-8591
Remote team member presenting a canvas on Vibe Board S1 in a hybrid meeting
A man is using Vibe Board S1 to present his ideas
Vibe Board S1 is integrated with 250+ mainstream workflow apps
User annotating a project directly on Vibe Board S1 with the Vibe Stylus
Team member presenting a design on Vibe Board S1 during a meeting
Designer interacting with Vibe Board S1 during a creative presentation
Customer feedback on Vibe Board S1
Vibe Board S1
A man is using Vibe Board S1 to present his ideas
Vibe Board S1 is integrated with 250+ mainstream workflow apps
User annotating a project directly on Vibe Board S1 with the Vibe Stylus
Team member presenting a design on Vibe Board S1 during a meeting
Designer interacting with Vibe Board S1 during a creative presentation
Customer feedback on Vibe Board S1
Vibe Board S1

The best-selling collaboration hub

Vibe Board S1
A man is using Vibe Board S1 to present his ideas
Vibe Board S1 is integrated with 250+ mainstream workflow apps
User annotating a project directly on Vibe Board S1 with the Vibe Stylus
Team member presenting a design on Vibe Board S1 during a meeting
Designer interacting with Vibe Board S1 during a creative presentation
Customer feedback on Vibe Board S1
Vibe Board S1 Ranked Amazon's #1 Best Seller in 2026Vibe Board S1 Earned Amazon's Choice Badge and a 4.5-Star Customer RatingVibe Board S1 Earns a 4.7-Star Rating on Reviews.io
To speak to a human, call:+1 (385) 341-8591
Full view of Vibe Board S1

The video player cannot render on the server side

Simple, all-in-one solution

Simple, all-in-one solution

Meet. Present. Brainstorm. Annotate.
Do it all with Vibe.

It’s an all-in-one tool
like a giant “iPad” for
ultimate productivity.

It’s a cloud-based whiteboard for
real-time collaboration.

It’s a conferencing solution
integrating with your favorite apps.

Office apps integrated with Vibe Board S1

It’s an easy-to-use smart display for
interactive teaching.

Education apps integrated with Vibe Board S1

Meet. Present. Brainstorm. Annotate. Do it all with Vibe.

It’s an all-in-one tool like a giant “iPad” for ultimate productivity.

It’s a cloud-based whiteboard for real-time collaboration.

It’s a conferencing solution seamlessly integrating with your favorite apps.

Office apps integrated with Vibe Board S1

It’s an easy-to-use smart display for interactive teaching.

Education apps integrated with Vibe Board S1
Performance

The most powerful smart whiteboard yet

The most powerful smart whiteboard yet

Experience
multi-touch
whiteboarding

with 20 touchpoints
Experience multi-touch whiteboarding with Vibe Stylus
4K wireless screencastfor optimal interactive presenting[2]
Magnetic stylusfor easy storage
Magnetic stylus for easy storage
Vibe Board S1 supports versatile connections that cover all your needs
Plug iconVersatile connectioncover all your needs
Be seen and heard clearlywith AI camera[1] — 4K sensor, 6 omni-directional mics
Vibe Board S1 with AI camera — 4K sensor, 6 omni-directional mics — make everyone be seen and heard clearly
Move around freelywith portable stand[1]
Vibe Board S1, with portable stand, can move around freely
Experience multi-touch whiteboarding with Vibe Stylus
Vibe Board S1 with AI camera — 4K sensor, 6 omni-directional mics — make everyone be seen and heard clearlyVibe Board S1, with portable stand, can move around freely
4K wireless screencast for optimal interactive presentingMagnetic stylus for easy storage
Vibe Board S1 supports versatile connections that cover all your needs
Download Specs
vibeos backgroundVibeOS

Powered by ChromeOS,
works like a super PC

#1 open ecosystem,
powered by ChromeOS

More about VibeOS

Contact sales

Have questions? Get to know Vibe with us.
Scale your team's productivity with volume plans
Build a tailored plan that fits your organization
Explore enterprise, security, and payment options
If you need a PO, please request a quote
Vibe Board S1 Ranked Amazon's #1 Best Seller in 2026
Vibe Board S1 Earned Amazon's Choice Badge and a 4.5-Star Customer Rating
Vibe Board S1 Earns a 4.7-Star Rating on Reviews.io
Contact salesHave questions? Get to know Vibe with us.
 
Vibe Board S1 Ranked Amazon's #1 Best Seller in 2026
Vibe Board S1 Earned Amazon's Choice Badge and a 4.5-Star Customer Rating
Vibe Board S1 Earns a 4.7-Star Rating on Reviews.io
imgimg
Team collaborating on a design project using the Vibe Board S1 smart whiteboard
Whiteboard

Seamlessly share
and co-create together

With Canvas, Vibe’s online whiteboarding software, team-wide brainstorming comes alive
and is captured in the cloud instantly.
Team collaborating on a design project using the Vibe Board S1 smart whiteboard - blurred
WhiteboardSeamlessly share and
co-create together
With Canvas, Vibe’s online whiteboarding software, team-wide brainstorming comes alive
and is captured in the cloud instantly.

Enjoy smooth,
intuitive whiteboarding

Enjoy smooth, intuitive whiteboarding
icon

Write, draw, and brainstorm with a familiar pen-on-paper feel, thanks to a swift 8ms response time.

icon

Grab a pen, marker, or laser pointer to build your work and easily highlight your notes.

icon

Convert scribbles into crisp, digital text and draw perfect shapes with AI-powered handwriting recognition.

Experience the pen-on-paper feel with an 8ms response time. Convert scribbles to digital text and draw perfect shapes with AI handwriting recognition.
video cover

The video player cannot render on the server side

Collaborate together
from any device

Collaborate together from any device
icon

Work together on an infinite canvas from any device – Vibe Board, web browser, tablet, or smartphone.

icon

Automatically save all discussions to the cloud in realtime, no need to worry about losing any ideas anymore.

icon

Enhance discussions with interactive comments, stickers, and annotations, for more dynamic conversations.

Work together on an infinite canvas that accessible from any device and automatically save all discussions to the cloud in realtime.
video cover

The video player cannot render on the server side

Easy access and sharing

Streamline workflow with easy access and sharing
ImportExport
icon

Pull in resources from local storage or your favorite cloud services, including Google Drive, Dropbox, and OneDrive.

icon

Jumpstart your work with pre-built templates that save you time and effort by providing a solid foundation for your projects.

icon

Pull in resources from local storage or your favorite cloud services, including Google Drive, Dropbox, and OneDrive.

icon

Jumpstart your work with pre-built templates that save you time and effort by providing a solid foundation for your projects.

ImportExport
Pull in resources from local storage, Google Drive, Dropbox, and OneDrive. Jumpstart your work with pre-built templates.
video cover

The video player cannot render on the server side

Business team presenting sales data on the Vibe Board S1 smart whiteboard during a hybrid meeting
Meet

Experience immersive
hybrid meetings

Better tools empower effective, coordinated meetings
across teams of all orientations—in-office, distributed, or both.
Business team presenting sales data on the Vibe Board S1 smart whiteboard during a hybrid meeting - blurred
MeetExperience immersive hybrid meetingsBetter tools empower effective, coordinated meetings
across teams of all orientations—in-office, distributed, or both.

Compatible across conferencing platforms

The only smart whiteboard solution that seamlessly integrates with all your favorite conferencing apps for an easy, plug-and-play experience.The only smart whiteboard solution that seamlessly integrates with all your favorite conferencing apps for an easy, plug-and-play experience.
video cover

The video player cannot render on the server side

Run collaborative
meetings easily

Run collaborative meetings easilyProjecting content from the Vibe Board to various digital displays around the room. Choose which content to show on each screen — video calls on one, Canvas on another.
logo

Stay connected with an AI-powered camera

Good meetings depend on good communication. Shrink the digital divide with our AI-powered Smart Camera, for high-quality remote video sharing that feels more natural than ever before.AI-powered SmartCam, for high-quality remote video sharing that feels more natural than ever before.
video cover

The video player cannot render on the server side

Marketing team outlining a campaign strategy on the Vibe Board S1 smart whiteboard
Present

Make your presentation
stand out

Engage your audience like never before with rich,
advanced features for presentation, annotation, and collaboration.
Marketing team outlining a campaign strategy on the Vibe Board S1 smart whiteboard - blurred
PresentMake presentation stand outEngage your audience like never before with rich,
advanced features for presentation, annotation, and collaboration.

Effortless screencasting for all devices

Effortless screen casting
PC screen casted to the Vibe Board S1 interactive display through HDMI IN
Video-InVideo-Out
Use HDMI IN/USB-C to input your computer screen to the Vibe Board.

Cast and note-take simultaneously

Cast your content to the board and bring up a canvas for note-taking alongside. View and interact on one side, and take notes on the other. Everything you need, all in one place.
video cover

The video player cannot render on the server side

Interactive annotations bring your slides to life

Enhance your slides with direct annotations on images, PDFs, and apps. Make key points stand out and captivate your audience.
video cover

The video player cannot render on the server side

Contact sales

Have questions? Get to know Vibe with us.
Scale your team's productivity with volume plans
Build a tailored plan that fits your organization
Explore enterprise, security, and payment options
If you need a PO, please request a quote
Vibe Board S1 Ranked Amazon's #1 Best Seller in 2026
Vibe Board S1 Earned Amazon's Choice Badge and a 4.5-Star Customer Rating
Vibe Board S1 Earns a 4.7-Star Rating on Reviews.io
Contact salesHave questions? Get to know Vibe with us.
Vibe Board S1 Ranked Amazon's #1 Best Seller in 2026
Vibe Board S1 Earned Amazon's Choice Badge and a 4.5-Star Customer Rating
Vibe Board S1 Earns a 4.7-Star Rating on Reviews.io
imgimg

Vibe Board for your workspaces

Vibe for your rooms
The Vibe Board S1 all-in-one smart whiteboard set up in a large conference room
For large meeting room •75″
The Vibe Board S1 all-in-one smart whiteboard set up in a huddle room
For huddle room •55″
The Vibe Board S1 all-in-one smart whiteboard set up in an open space
For open space •75″
The Vibe Board S1 all-in-one smart whiteboard set up in CXO's office
For executive office •55″
The Vibe Board S1 all-in-one smart whiteboard set up in an executive office
For large meeting room •75″
The Vibe Board S1 all-in-one smart whiteboard optimizing a compact huddle room
For huddle room •55″
The Vibe Board S1 all-in-one smart whiteboard set up in an open workspace
For open space •75″
The Vibe Board S1 all-in-one interactive display mounted in a spacious boardroom
For executive office •55″
For ITEasy to enroll and
manage. Super secure.
Ready for use in classrooms straight out of the box.
Easy fleet management with policy-based admin console.
Single sign-on (SSO) authentication.
Maintain complete control with device administration.
SOC 2 compliance certification badge for the Vibe Board S1Ensure rigorous security with SOC 2 certification.
Q-SYS certification badge for the Vibe Board S1Certified Q-SYS platform integration.
Kudos

Trusted by 40,000+ forward-thinking entrepreneurs

Trusted by 40,000+ forward-thinking entrepreneurs

Ian Westerman

“It’s enabled me to communicate in more ways, and more interesting ways. Vibe has made it easy to differentiate yourself in some kind of way.”

Mike McHargue

“Vibe turned out to be a great solution for me and for my business. I can work with more teams in a given week, reaching twice as many clients.”

User sharing ideas on the Vibe Board S1 smart whiteboard
Product team mapping out a project roadmap on the Vibe Board S1
David

“The Vibe board gets all the big ideas out of my head and into the world for my team to see and take action on. I use it for training the team, brainstorming, and keeping track of everyone's key projects.  I enjoying using the Vibe board and look forward to the days I spend working on it.”

Eitan

“My Vibe Board has been my daily companion and savior and I have received many compliments from clients on how professional my setup is and how helpful it is to be able to collaborate on the board.”

Product team mapping out a project roadmap on the Vibe Board S1
Jason Lamb

“This is the best tool we’ve purchased for team collaboration! We were so impressed with our productivity with the tool that we have since purchased 4 more 55” VIBE boards. I lead a team of 9 people within our organization, 3 of whom are remote, and VIBE is amazing at collaborating even when everyone isn’t in the same room.”

User feedback and ratings on Vibe Board S1 smart whiteboard

Try Vibe Board
risk-free today!

Free shipping within U.S.
Try Vibe for 30 days
Standard free warranty

Resources

Product BrochureProduct Brochure
PDF
Explore more Vibe Board capabilities
Download
Tech SpecsTech Specs
PDF
Dive into the details of the hardware
Download

FAQ

  • Is the Vibe Board S1 a standalone system or do I need a computer with it?

    Vibe S1 is an all-in-one smart board for conference room solution that combines an interactive digital whiteboard with an open ecosystem VibeOS based on ChromeOS, our whiteboarding app Canvas, an optional Smart Camera, and the companion app Vibe One. It’s all designed for next-level team collaboration.
  • Does the Vibe S1 have built-in audio and a microphone?

    The Vibe Board S1 55″ has 2 built-in speakers, while the Vibe Board S1 75″ has 3 built-in speakers. However, neither model has a built-in microphone or camera. Our specially designed Smart Camera is compatible with the Vibe Board S1 and includes 6 built-in microphones in a 3D array, as well as noise cancellation and echo cancellation for better sound. You can also use other compatible USB-C microphones.

  • What are the product dimensions?

    For the Vibe S1 75″
       - Diagonal screen size: 75″
       - Product dimensions: 67.7″ (width) x 39.9″ (height) x 3.4″ (depth)
       - Product weight: 127.9 lb
       - VESA Mount: 800mm x 400mm
    For the Vibe S1 55″
       - Diagonal screen size: 55″
       - Product dimensions: 50.7″ (width) x 29.3″ (height) x 3.0″ (depth)
       - Product weight: 50.7 lb
       - VESA Mount: 200mm x 200mm

  • What types of cabled accessories are supported by Vibe?

    Vibe provides connectivity options with three USB-C ports and one HDMI-In port, accommodating a range of cabled accessories.

  • Is a stand or wall mount included with the purchase of a Vibe Board S1?

    The Vibe Board S1 75″ includes a wall mount, but it is not part of the package for the S1 55″. However, we do offer elegantly designed mobile stands in four colors, which are easy to install. Please note, that these mobile stands are sold separately and are not included with the Vibe Board itself.
    Vibe Board S1 is also compatible with many other types of stands or wall mounts, depending on your needs or requirements. You can find more information on third-party stand & mount options with this link.

1. Accessories (stand, camera, and tap) sold separately. Add-on discounts available when purchased together.2. Vibe Tap enable 4K wireless screencasting.
1. Accessories (stand, camera, and tap) sold separately. Add-on discounts available when purchased together.2. Vibe Camera features a 4K sensor and 6 omni-directional microphones.3. Vibe Tap enable 4K wireless screencasting.